BS EN 60060-2-2011 pdf download

08-07-2021 comment

BS EN 60060-2-2011 pdf download.High-voltage test techniques Part 2 : Measuring systems.
3.7.4
performance test
test performed on a complete measuring system to characterize it under operating conditions
3.7.5
performance check
simple procedure to ensure that the result of the most recent performance test is still valid
3.7.6
reference record (impulse measurements only)
record taken under specified conditions in a performance test and retained for comparison with records to be taken in future tests or checks under the same conditions
NOTE Reference records are often called lingerprlnts and used as characteristics of dynamic behaviour- In impulse voltage measurements they are usually taken from step response measurements (Annex C).
4 Procedures for qualification and use of measuring systems
4.1 General principles
Every approved measuring system shall undergo initial testing, followed by performance tests (periodic, see 4.2) and performance checks (periodic, see 4.3) throughout its service life. The initial tests consist of type tests (performed on a component or system of the same design) and routine tests (performed on every component or system).
The performance tests and checks shall prove that the measuring systems can measure the intended test voltages within the uncertainties given in this standard, and that the measurements are traceable to national and/or international standards of measurement. The system is approved only for the arrangements and operating conditions included in its record of performance.
A major requirement for a converting device, a transmission system, and a measuring instrument used in a measuring system is stability within the specified range of operating conditions so that the scale factor of the measuring system remains constant over long periods.
The assigned scale factor is determined in the performance test by calibration. The user shall apply tests given in this standard to qualify their measuring system(s). Alternatively, any user may choose to have the performance tests made by a National Metrology Institute or by a Calibration Laboratory accredited for the quantity to be calibrated, In all cases, the user shall include the test data into the record of performance.
Any calibration shall be traceable to national and/or international standards. The user shall ensure that any self-made calibration is performed by competent personnel using reference measuring systems and suitable procedures.
NOTE Calibrations performed by a National Metrology Institute, or by a laboratory accredited for the quantities calibrated and reported under the accreditation, are considered traceable to national andlor international standards,
4.2 Schedule of performance tests
To maintain the quality of a measuring system, its assigned scale factor(s) shall be determined by periodic performance tests. The interval between performance tests shall be based on evaluation of past stability of the measuring system. It is recommended that the performance test should be repeated annually, but the maximum interval shall not be longer than five years.
NOTE Long intervals between performance tests can increase the risk of an undetected change in the measurement system.
Performance test shall be made after major repairs to the measuring system and whenever a circuit arrangement that is beyond the limits given in the record of performance is to be used.
When a performance test is required because a performance check shows that the assigned scale factor is no longer valid, the cause of this change shall be investigated before the performance test is made.
4.3 Schedule of performance checks
Performance checks shall be made at intervals based on the recorded stability of the measuring system as shown in the record of performance. The interval from the last performance test or the last performance check shall not be longer than one year.
For a new or repaired measuring system, performance checks shall be made at short intervals to demonstrate its stability.
No reference method is identified for the performance checks because the required accuracy
is less than that required for performance tests.
4.4 Requirements for the record of performance
4.4.1 Contents of the record of performance.BS EN 60060-2-2011 pdf download.

                                           Related Information                                             Download
PS:Thank you for your support!
BS EN 12607-3-2000 pdf download BS Standards

BS EN 12607-3-2000 pdf download

BS EN 12607-3-2000 pdf download.Methods of test for petroleum and its products — BS 2000-460.3: Bitumen and bituminous binders — Determination of the resistance to hardening under the influence of heat and air — Part 3: RFT...
Read More
EN 12329-2000 pdf download BS Standards

EN 12329-2000 pdf download

BS EN 12329-2000 pdf download.Corrosion protection of metals — Electrodeposited coatings of zinc with supplementary treatment on iron or steel. This BS EN 12329 specifies requirements for electrodeposited coatings of zinc on iron or steel witt supplementary...
Read More
BS EN 1430-2000 pdf download BS Standards

BS EN 1430-2000 pdf download

BS EN 1430-2000 pdf download.Methods of test for petroleum and its products — BS 2000-292:Bitumen and bituminous binders — Determination of particle polarity of bitumen emulsions (Identical with IP 292-2000). This BS EN 1430 specifies a method...
Read More

LEAVE A REPLY

Anonymous netizen Fill in information