SAE J772-2000 pdf download

12-27-2022 comment

SAE J772-2000 pdf download Clearance Envelopes for Six-Bolt, Eight-Bolt, and Rear Truck Transmission Mounted Power Takeoffs
1. Scope—This SAE Recommended Practice is intended as a guide toward standard practice but may be subject to frequent change to keep pace with experience and technical advances.
1.1 Purpose—The purpose of this document is to provide dimensions of clearance envelopes for various types of six-bolt regular-duty, eight-bolt heavy-duty, and side- and rear-mounted truck transmission power takeoffs. These envelopes are applicable to the clearance required immediately adjacent to the power takeoff openings on truck transmissions. Clearance envelopes are provided for the purpose of documenting current practice. It must be recognized that many current designs do not provide these clearances in all orientations and variations. New transmission and power takeoff designs should attempt to adhere to these envelopes where practical, but they should not be construed to be design restrictive; ultimately, the actual power takeoff clearance must be established for each application. In order to provide realistic envelope sizes, there are seven basic “types” of side-mounted P.T.O. envelopes and rear-mounted envelopes as shown in Table 1 .
All envelopes shown are basic and can be reversed for output to the front or rear of the vehicle. On Types II, III, IV, and VI, output shaft locations can additionally be reversed from that shown to the opposite side of the P.T.O. opening centerline. Driveline envelopes, front or rear, above or below centerline of opening as required, must be a cylinder of the minimum diameter shown and fall within the 1 5 degree maximum half-cone extending vertically up and down and horizontally outward from the driveline cone apex, for a distance equivalent to that required to bring the P.T.O. driveline beyond points of interference so that auxiliary equipment can be driven.
Clearance should be provided on six-bolt openings on mechanical transmissions for Types I, II, and III with Types I and II being a minimum requirement. Clearance should be provided on automatic transmissions for Types IV and VI depending on six- or eight-bolt P.T.O. openings. Mechanical transmissions with eight-bolt openings should have Type V and VI clearances provided.
Direct mount hydraulic pump clearance envelopes are included as an option, and are commonly used with Types II, IV, and VI P.T.O. envelopes. If pump clearance is restricted it should be evaluated on a specific basis. If specific pump sizes are not available, direct mount pump clearance envelopes should be used as shown in Table 2.

                                           Related Information                                             Download
PS:Thank you for your support!
SAE AS 39029-79-2000 pdf download SAE Standards

SAE AS 39029-79-2000 pdf download

SAE AS 39029-79-2000 pdf download CONTACTS, ELECTRICAL CONNECTOR, PIN, CRIMP REMOVABLE, SHIELDED (FOR MIL-C-28748/9 CONNECTORS) REQUIREMENTS: Dimensions, design characteristics, and configuration: See figure 1 and table I. Tools: See table II. Preparation of samples: Contacts shall be...
Read More
SAE AS 39029-83-2000 pdf download SAE Standards

SAE AS 39029-83-2000 pdf download

SAE AS 39029-83-2000 pdf download CONTACTS, ELECTRICAL CONNECTOR, PIN, CRIMP REMOVABLE (FOR MIL-C-28840 CONNECTORS) REQUIREMENTS: Dimensions, design characteristics, and configuration: See figure 1 and table I. Tools: See table II. Localized finish option: Applicable contacts shall be...
Read More
SAE AS 39029-84-2000 pdf download SAE Standards

SAE AS 39029-84-2000 pdf download

SAE AS 39029-84-2000 pdf download CONTACTS, ELECTRICAL CONNECTOR, SOCKET, CRIMP REMOVABLE (FOR MIL-C-28840 CONNECTORS) This specification is approved for use by all Departments and Agencies of the Department of Defense. The requirements for acquiring the Synchros described...
Read More

LEAVE A REPLY

Anonymous netizen Fill in information